caltrans lane closure charts

Otherwise, Federal (MUTCD) codes are shown. Before opening a roadway to unrestricted public traffic, the final delineation must be in place on the roadway either by using long-term or short-term temporary delineation or channelizing devices. Include the district TMP manager, the DTM, and the public information officer as appropriate in preconstruction or work planning meetings. Verify that construction area signs are placed outside the traveled way, do not block or protrude more than 4 inches into bicycle and pedestrian routes, and comply with Americans with Disabilities Act requirements. Cold storms bringing wind, rain and low-elevation snow heavy at times are forecast through early March. Consult with the district traffic manager for assistance with these items. The public distribution of the environmental document includes local businesses that may be affected and notifies them of any public hearing. Verify that traffic handling devices meet the visibility and legibility requirements. Review these requirements with the contractors before work starts. Within 45 calendar days of receipt of the invoice, the district COZEEP coordinator reviews and approves the summary and submits it for payment to the Caltrans Division of Accounting, which uses it as the receiving record for payment. Complete training in one sitting. The following guidelines are intended only to guide engineering judgment and ingenuity: Following are guidelines for the design of roadways carrying traffic through work zones. The Changeable Message Sign Guidelines developed by the Division of Traffic Operations provide a listing of approved abbreviations for PCMSs. Once the task order is completed and signed by the Caltrans person requesting the services, fax, email, or send it to the local CHP area office. In general, closures on two-lane highways and daytime closures on multi-lane highways do not require COZEEP. An impact attenuator vehicle must be used for the placement and removal of temporary traffic control devices when required by the contract. If a change order is processed that requires COZEEP support, and it is estimated that existing state-furnished materials funding for COZEEP is not sufficient, include additional funding for COZEEP as part of the change order. Confirm temporary flashing beacon systems comply with the requirements in Section 12-3.34, Temporary Flashing Beacon Systems, of the Standard Specifications. Example Transportation Management Plans - FHWA Work Zone Discuss comments or suggestions regarding traffic control with district Design and Traffic Operations during the projects planning and design phase. The contract item for PCMSs, commonly bid as furnish-each or furnish-lump sum, includes all costs for placement, operation, maintenance, relocation, and removal of the signs. Temporary crash cushions may be installed on wooden pallets as an option. Review Section 81-3, Pavement Markers, of the Standard Specifications. Obtain from the contractor, the completed Form CEM-2311, Temporary Pedestrian Access Route Contractor Compliance Report, within 2 business days after construction of a temporary pedestrian access route. Report an Issue. File formats include CSV, JSON, TXT and XML. In the transition, if physically possible, give the driver at least the same effective traversable roadway widthand preferably moreas on the approach roadway. If the opening has a drop off behind it that might present a hazard to the public, document in the resident engineers daily report an exception to the Standard Plans note and have the contractor close the gap for public safety purposes. Verify the base is shaped to prevent rolling if struck by vehicles. Live Traffic Cameras View live traffic conditions by regions and areas. In many cases, placing a PCMS behind existing guard railing will protect it. Confirm that AFAD are placed in accordance with the plans and where clearly visible to the AFAD operator and to approaching traffic. The statewide agreement requires that cancellations be made during normal working hours and at least 24 hours before the time that the CHP is to arrive on the project. Verify the proper types of flashing arrow signs are used. Inspect Category 2 temporary traffic control devices to confirm they are labeled with the FHWA acceptance letter code and the name of the manufacturer. Lane Closure System (LCS) Mobile Statusing - California Verify the contractor cements the bases of channelizers used for temporary edge line delineation as specified. Verify the crash cushion array is in place before opening traffic lanes adjacent to the protected obstacle. Visualize what effects changing conditions of visibility and lighting will create. Motorists who are forewarned of construction conditions may be more tolerant of delay and inconvenience and probably will be more alert and responsive to work zone traffic control. Perform additional reviews periodically throughout the construction project, since changes may affect the facilitys effectiveness. Some reviews should take place at night, particularly when a major traffic change has taken place. During the planning and design phase of any project, an impact study is made for a proposed prolonged ramp closure. Lane Closures - California The CSC should document the reviews in the project records and discuss concerns about the traffic control plan or traffic safety with the construction engineer, traffic engineer, and resident engineer. Use alternate methods to delineate this type of surface. Most parts are self-explanatory. The following COZEEP use criteria do not form an all-inclusive list. Directs the termination or modification of active planned lane closure operations when traffic delays become significant, without compromising traveler or worker safety. Request a list of Category 2 temporary traffic control devices to be used on the project and copies of their Federal Highway Administration (FHWA) acceptance letters. Request a certificate of compliance for Type K temporary railing. If the equipment is not available, make other arrangements as soon as possible. The closure will impact southbound Highway 70 between Woodruff Lane and Laurellen Road starting from 8 p.m. Friday (April 9) until 5 a.m. Monday (April 12). To establish the geometry, markings, devices, and signs that existed during the project, maintain in sufficient detail a record of the placement into service, the changes, and the discontinuance of roadways and detours. The contingency action plans should include detailed operations undertaken in case a major activity passes the late-finish milestone. If the temporary automated end of queue warning system malfunctions for a cumulative period of 4 hours or more, no payment will be made for the day. Traffic Control Plans and Detour Plans - Sacramento County, California Economy will be a factor only as necessary to obtain balance between benefits and resources. The LCS will send the contractors employees a unique password by email after the accounts are created. Additional signs ordered by the resident engineer are paid for as extra work. Inspect all traffic control devices to verify conformity with the specifications. Adjustments should be made to create adequate sight distance, to avoid locations that require drivers to make multiple decisions, to accommodate expected queues, and to coordinate activities at multiple locations. To avoid having to obtain more than one speed reduction order per project, verify that the limits requested in the order cover the maximum distance where reduced speed would be required at any time during the life of the contract. The following elements affect the drivers ability to navigate the intended path: Pavement surface condition, texture, and color. Retroreflective sheeting on channelizers. Mobile Require at all times the presence on the job of personnel representing the contractor who are capable of and empowered to make decisions quickly if the need arises. When changes are necessary, make one change at a time. Verify the contractor removes traffic-handling equipment and devices from the job site when they are no longer needed for controlling traffic. Some districts have adopted a practice of providing motorists additional warning by displaying information a mile or more in advance of the closure using portable or fixed changeable message signs. This will be paid under a contract bid item. Also, verify that flagging stations are laid out correctly, are visible to approaching traffic, are illuminated during nighttime, and have correct advance warning signs. If the contractor requests additional CHP support beyond what the project plan includes, you may, if appropriate, write a change order. If advanced flaggers or additional flaggers are not shown or specified, then Caltrans pays 100 percent by change order. Consider suspending work for the next shift until a written plan is provided to address future public safety. The cost estimate used in the plans, specifications, and estimate is based on the expected number of events needing COZEEP identified during project development. Reviews the contractors contingency plan. Reviewing the needs and control of all road users is an essential part of highway construction, utility work, maintenance operations, and the management of traffic incidents through a work zone. The contractor compliance report forms are available at: Verify the flashing arrow sign trailer can be leveled and plumbed. Confirm that the contractor cancels scheduled closures that are not needed at least 2 days in advance, using the LCS. If the proposed materials have been previously used, check them for acceptability listed in the ATSSA publication. Acts as a resource for the resident engineer, the DTM, and the TMP manager during TMP implementation. The request has been submitted in a timely manner. Category 2 devices include barricades and portable sign supports. If a change order modifies the plans, construction engineers should take steps necessary to verify that the modified plans are adequate to provide the highest level of traffic safety and service consistent with conditions actually encountered. Caltrans | Edhat Major lane closuresthose expected to result in significant traffic effects despite the implementation of TMPs. Require the contractor to keep signs clean and clearly visible, and repair them if damaged. Portable flashing beacons are measured and paid for at contract item price by the unit except when they are part of a traffic control system. Verify channelizers used for temporary edge line delineation are predominantly orange and the surface- mounted type. To sign up for the training, submit a training request in Staff Central for this course by following the instructions on the Division of Construction's How to Request Training intranet page. Additional devices are placed in sequence, moving in the direction of the traffic flow. Dated notations or revisions to plans may be helpful. Place all remaining signs and devices in sequence through the work area. For traffic control requirements, refer to Section 12, Temporary Traffic Control, of the Standard Specifications and the California Manual on Uniform Traffic Control Devices (California MUTCD). Before opening lanes to traffic, remove or obliterate all conflicting traffic stripes and markings. Review Section 12-3.11, Construction Area Signs, of the Standard Specifications for additional requirements. The change order must clearly state there will be adjustment on the traffic control system item by reason of this change. Select a District or Statewide to start. TMP strategies are designed to maintain additional delays below this maximum threshold, that is, less than 15 or 20 minutes. Treat the traffic lanethe path the car is intended to followas a critical element of the roadway. Keep the projects completion dates current in the LCS. Verify that all traffic control devices are correctly placed and functioning properly. Take special care to consider areas in schools or senior citizen center locations. Hand digging is required unless the location is free of underground utilities. Section 4-73, Concrete Curbs and Sidewalks, of this manual provides policies and procedures for those facilities. Determine if the temporary traffic control devices to be used are on the Authorized Material List for Signing and Delineation Materials and if they require a certificate of compliance. Closures that will reduce horizontal or vertical clearances require even more notification. Significant traffic effectan individual traffic delay of 30 minutes or more above normal travel time during recurring congestion on the existing facility. Review Section 12-4.05, Bridge Cleaning and Painting Activities," of the Standard Specifications. The Department has standardized its road and lane closure reporting into a statewide Lane Closure System (LCS). Refer to Section 2-214D, Construction Contingency Plan, of this manual. Do not exceed the maximums shown in the requirements listed in Section 4.3, Accessibility Design Standards, of Design Information Bulletin Number 82-06. Caltrans lane closure charts. Document this inspection in the daily report; indicate weather, traffic conditions, and time of inspection. AALRR Scores Major Win for AGC-San Diego in Arbitration Against the Consider sight distance for drivers because of temporary features such as falsework impeding view of traffic signal systems. Type K temporary railing placed within 10 feet of a traffic lane requires a reflector on each rail unit. Use of 180-day temporary pavement markers on an open-graded surface is not advised; when removed, the marker glue can peel up the open grade. Avoid placing entering transitions on or just beyond horizontal curves or the crest of a summit vertical. @CHP_Chico. Extend exit ramp tapers back through the closure as an extension of the ramps shoulder line. Portable Changeable Message Signs (PCMS) are required only during times, places, or activities stated in the plans and specifications and are not required when the traffic control system is nonoperational or for discretionary use. Time and mileage are based on officers starting and stopping times at their reporting station and include travel to and from the project. Calculate the adjustment on a force account basis. How the contractor will meet the projected rates for material delivery to the job site. Section 7-1.02A, General, requires the contractor to comply with current laws, regulations and decrees. Signs and other devices mounted lower than 7 feet above the temporary pedestrian pathway should not project more than 4 inches into accessible pedestrian facilities. 1-800-427-7623 for current highway conditions. Consider additional signage and temporary lighting for crossovers. Any contractor requests for COZEEP that are denied by the resident engineer should be in writing to the contractor stating the reasons for denial of the COZEEP support. Caltrans Design Information Bulletin 82-06, Pedestrian Accessibility Guidelines for Highway Projects, which addresses requirements for pedestrian accessibility for public use in new construction and alterations of existing facilities. Periodic project safety reviews should note deficient areas and provide recommendations for the contractor to correct those deficiencies. Caltrans can enforce contractor compliance with closure pickup deadlines in two ways: Caltrans can order a contractor to pick up a closure early if traffic delays become significant because of a project incident or activities outside the project area. Types include plastic traffic drums, portable delineators, channelizers, tubular markers, traffic cones, and Type 1 and Type 2 barricades. Verify that pedestrian facilities comply with the Americans with Disabilities Act. Refer to Section 5-1.20 Coordination with Other Entities, of the Standard Specifications, if applicable, and the special provisions. Traffic cones are paid for as part of the contract item for the traffic control system. Check Type 3 barricades, used as sign supports, for label with FHWA acceptance letter number showing they have been crash tested as a single unit with a sign panel of the size and type used on the project. The contract item price also includes the costs of work necessary to restore channelizers damaged by public traffic. Review the submittal for any Type 3 barricade to be used as sign support for crashworthiness to the Transportation Research Boards NCHRP Report 350 criteria or the American Association of State Highway and Transportation Officials (AASHTOs) Manual for Assessing Safety Hardware (MASH) as a single unit with a sign panel of the size and type used on the project. Avoid traffic splits if possible. A pedestrian traffic handling plan may be required if the contract plans do not identify the affected facility. Resolve any accounting differences between the information Caltrans gives the CHP and the internal information CHP obtains from its payroll system. Verify that the contractor installs, relocates, covers, and removes signs as required. The contractor is responsible for the replacement expenses. ODOT permitted lane closure chart example . Generally, the district traffic operations office is responsible for this review activity. In metropolitan areas, this type of warning may be feasible with cooperation of the transportation management center. Administration of traffic control may be delegated to another person assigned to the project. Section 12, Temporary Traffic Control, directs the contractors attention to the. Midblock worksites should not cause pedestrians to skirt the worksite or make a midblock crossing. Anticipated length of time, rounded to the nearest 5 minutes, to pick up the closures. Twenty-four-hour-a-day regulatory speed reductions require coordination with the local CHP office before implementation. Verify that temporary crash cushion modules used were manufactured after March 31, 1997. The cost of covering, uncovering, and removing signs (when they are no longer needed) is included in the contract price for construction area signs. When multiple projects in one area occur at the same time, require contractors to coordinate their efforts by resolving schedule conflicts before submitting their schedules for closures, and verify there are no closure conflicts before implementation. Verify that the weight of the attenuator and the weight of the support truck are within the specified limits as shown on the Authorized Material List for Highway Safety Features. Withhold some payment from progress pay estimates to cover the cost of removing Type K temporary railing. 2170. Consideration for worker safety and the safe movement of traffic through work zones starts with planning. Refer to Section 4-1202C (1a), Lane Closure System, of this manual. The activities would, therefore, cause the closure to remain past the time allowed in the closure charts. Containment may require modestly increasing the spacing between signs or require the placing of additional signs. The lump sum payment for this item includes all costs for placement, operation, maintenance, relocation, and removal of the Automated Work Zone Information System. Night construction activities, such as replacing pavement slab, replacing bridge joint seals, and replacing pavement markers, that can create an unexpected condition for driverseven those familiar with the highway. The COZEEP coordinator must verify invoices received from CHP against the tracking expenditures spreadsheet. Verify that covers placed on sign panels completely block out any messages so that the messages cannot be seen day or night. Caltrans attempts to maintain safe and convenient access for pedestrians and bicyclists, who are susceptible to disruptions because of their slower speeds and sensitivity to uneven surfaces, noise, airborne dust, road debris, and fumes. Verify that the line of sight visibility in the field meets sight distance standards. Provides pedestrians with a reasonably safe, convenient, and accessible path that replicates, as nearly as practical, the most desirable characteristics of the existing sidewalks or footpaths. Inspect TPARs weekly to verify that they are clean and unobstructed and comply with the Americans with Disabilities Act and the work plan required by the specifications. Verify that the contractor maintains an unobstructed roadside when work is not in progress. PCMS can be used in place of an advance flagger to remove workers from the roadway to improve worker safety from traffic. Do not use the contract item for Type K temporary railing to pay for temporary railing that is placed to fulfill the requirements of the Public Safety section. When severe congestion is forecast because of capacity reductions, include plans for using the media to notify the public, Construction Zone Enhanced Enforcement Program (COZEEP) services, alternate route development, metering by upstream ramp closures, changeable message signs, radar feedback speed signs, highway advisory radios, and monitoring the end of the traffic queue. Verify the required signs are placed during the cleaning and painting activities and removed at the end of each work shift. Each advance warning sign shall be equipped